Contract 56662 REL 54: 1988-115-35 EXP YKFP KLICKITAT HATCHERY/ WAHKIACUS DESIGN
Project Number:
Title:
Klickitat River Design and Construction-Yakima/Klickitat Fisheries Project (YKFP)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Klickitat 100.00%
Contract Number:
56662 REL 54
Contract Title:
1988-115-35 EXP YKFP KLICKITAT HATCHERY/ WAHKIACUS DESIGN
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
MA 56662-00054, PI 1988-115-35 EXP YKFP KLICKITAT HATCHERY/ WAHKIACUS DESIGN      

With this amendment the YN and BPA agree to discontinue design development of the proposed Wahkiacus Hatchery Acclimation Facility (WAF), after June 30, 2014, until such time as Yakama Nation Tribal Council finalizes review and determines an acceptable course of action for that tribally owned property.  The Tribal Council decision document will then be presented to BPA at which time the YN-YKFP and BPA will either reinitiate design actions within this contract, or develop an alternate strategy through the Accord Agreement to meet biological objectives for Klickitat basin stocks.  


PROJECT PURPOSE:

The Klickitat Fishery YKFP expense design Project (Klick D & C) will advance Step 2 design requirements of prioritized capital construction elements listed below.  These elements are guided by the 2012 Klickitat River Anadromous Fisheries Master Plan (KMP), Klickitat Hatchery Complex Program Environmental Impact Statement (EIS) and available capital funding. As identified in the KMP, the primary project goal is to increase the natural production, distribution and harvest opportunities for steelhead, spring Chinook, while enhancing the harvest opportunities of fall Chinook, and coho, minimizing potential negative interaction with other salmonids in the Klickitat Subbasin.  The KMP provides the detail of proposed techniques to reform hatchery practices with required new infrastructure and prioritized habitat restoration. The KMP has established biological goals and objectives that will contribute to the accomplishment of the overall goal of increasing fish numbers and distribution within the Subbasin. The biological goals, which are consistent with the NPCC Fish and Wildlife Program (NPCC 2000), are designed to achieve both the biological performance of the target species and improve environmental conditions to allow sustainable populations.

This project will provide the necessary Step 2 Council Review information needed for design work, permitting and construction/facility upgrades, to the proposed Wahkiacus Acclimation Facility and the existing YN-owned, NOAA O&M-funded Klickitat Hatchery near Glenwood, Washington.  As outlined in the KMP, each facility that is upgraded or constructed using hatchery reform principles, will be linked to the recently completed Lyle Falls Fishway Broodstock Collection Facility and Castile Falls Fishway Monitoring Facility.

Priority facilities for design under this contract:

1.  Wahkiacus Hatchery
2.  Klickitat  Hatchery
        
  
GENERAL BACKGROUND:
The Yakama Nation has actively managed fish and wildlife on their Tribal lands for more than 58 years.  During this time, wild and artificially produced spring Chinook (Onchorynchus tshawytscha), fall Chinook (O . tshawytscha), coho (O. kisutch), and steelhead (O. mykiss) in the Klickitat Subbasin have been managed to ensure their long-term existence and provide fishing opportunities in an effort to mitigate for the loss of fisheries due to construction of the Columbia River hydroelectric dams.

The Klickitat Hatchery, Lyle Falls Fishway, and Castile Falls Fishway were built as part of an effort to mitigate for lost fishing opportunities.  The operation of the three facilities, which was previously operated by the Washington Department of Fish and Wildlife, was transferred to the Yakama Nation in December 2005.  They are operated under the Yakima/Klickitat Fisheries Program (YKFP). The YKFP uses artificial production to re-establish, supplement, and/or increase natural production of anadromous salmonids and harvest opportunities while maintaining long-term fitness of the target populations and minimizing or avoiding impacts on non-target species.
Account Type(s):
Expense
Contract Start Date:
09/01/2013
Contract End Date:
05/31/2016
Current Contract Value:
$86,099
Expenditures:
$86,099

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Shirley Alvarado Yakama Confederated Tribes Yes Administrative Contact shirley_alvarado@yakama.com (509) 865-5121x6304
Rossana Callejas Bonneville Power Administration No Administrative Contact rxcallejas@bpa.gov (503) 230-7558
Mary Haight Bonneville Power Administration Yes COR mthaight@bpa.gov (503) 230-3112
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Mel Sampson Yakama Confederated Tribes No Supervisor mel@yakama.com (509) 865-5121x6303
Bill Sharp Yakama Confederated Tribes Yes Contract Manager Bill_Sharp@yakama.com (509) 865-5121x6355
Gregory Smith Bonneville Power Administration Yes Env. Compliance Lead gmsmith@bpa.gov (503) 230-5049
Adrienne Wilson Yakama Confederated Tribes Yes Administrative Contact Adrienne_Wilson@Yakama.com (509) 865-5121x6306


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
BPA EC B: 165. BPA Environmental Compliance 05/31/2016 05/31/2016
All administrative tasks fulfilled with timely quality products C: 119. YKFP Project Management 05/31/2016 05/31/2016
Revised hatchery construction conceptual designs D: 175. Conceptual Designs for WAF/KH 05/31/2016 05/31/2016
Revised hatchery construction conceptual designs E: 175. Conceptual Designs for KH only 05/31/2016 05/31/2016
Select design concept, develop MOA and RFP F: 114. Selection of preferred design concepts 05/31/2016 05/31/2016

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 114 Identify and Select Projects
  • 2 instances of WE 175 Produce Design
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 114 Identify and Select Projects
  • 2 instances of WE 175 Produce Design
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 114 Identify and Select Projects
  • 2 instances of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 07/01/2012
B 165 BPA Environmental Compliance 08/06/2013
C 119 YKFP Project Management 09/01/2013
D 175 Conceptual Designs for WAF/KH 09/01/2013
E 175 Conceptual Designs for KH only 03/05/2014
F 114 Selection of preferred design concepts 08/06/2013
G 132 No Annual Report required 09/01/2013
H 119 FISMA Attestation 09/01/2013